Agan Chemicals

Establishment of a new Electrostatic plant, as part of the Ministry of Environmental Protection campaign.

The work included the following main activities:

  • Installation of two flares 60 [m] long each.
  • Installation of 20 skids and equipment
  • Fabrication, installation and testing of Interconnect Piping spools.
  • Structure fabrication and installation.